Follow Our Project
Live Telegram Feed
Recent Videos

Undeveloped Side vs Managed Side — Same Rain, Different Result
Welcome to Occupy the Land. After the rain we walk the south end of the 18 acres, from the southwest corner down toward the sand

Tractor Lift Day: Completing the 20ft Sphere
Welcome to Occupy the Land. We finish the top half of the 20ft geodesic sphere, lift it with the tractor, and bolt it onto the

Assembling the Top of the Sphere + First Real Rain Test
Welcome to Occupy the Land. Donna and I assemble the top half of the 20ft geodesic sphere in about an hour using color-coded struts, longer

Homestead Maintenance Day: Slime, Shredder & Sphere Floor
Welcome to Occupy the Land. This week we turn the root cellar floor into something we can actually work on. After setting laser-leveled conduit markers,

Root Cellar Halfway: Backfill, Doorway & Sphere Assembly
Welcome to Occupy the Land. This week we keep chipping away at the 20ft geodesic root cellar. Donna wires the hog fence and we stitch

Root Cellar Floor Takes Shape in 108° Heat
Welcome to Occupy the Land. This week we’re focused on the root cellar floor. After wiring the hog fence and measuring 56 feet of fiberglass